AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |
Back to Blog
Dx coil selection software5/2/2023 Heat Pipes have been site installed by this method in many locations inside the United States, including Hawaii, as well as the Caribbean, Asia, and South America. A site installation crew from HPT is sent to install the Heat Pipes. Air conditioning units are site inspected with all measurements taken Heat Pipes are then designed and built to fit. Units are retrofitted on site by HPT Heat Pipe trained technicians. Site Installed Wrap-Around Dehumidifier Heat Pipes - DHP-S™ NEW: A/C units are shipped by the manufacturer/contractor to the HPT facility in Tampa, Florida where they are factory retrofitted and then shipped to the final destination. Methods of Installation Factory Installed Wrap-Around Dehumidifier Heat Pipes - DHP-F™ The Heat Pipe is activated by the temperature difference between the air entering the precool Heat Pipe and the air leaving the cooling coil.ĭehumidifier Heat Pipes can be installed around chilled water cooling coils as well as direct expansion (DX) cooling coils. The function of the Heat Pipe is performed passively without any mechanical moving parts. The precooled air then approaches the cooling coil at a lower temperature, allowing it to be overcooled by the cooling coil before being reheated by the second Heat Pipe module. The first Heat Pipe module precools the entering air before it goes through the cooling coil. HPT dehumidifier Heat Pipes are usually installed in A/C units in a ”wrap-around” configuration.
0 Comments
Read More
Leave a Reply. |